• info@solar-farms.co
  • 0330 133 5622

Case Studies

View our latest work

40MW Ground Mount

This case study examines the successful full scope build of a 40MW solar farm in Southern England where Solarizon was the main contractor.

The project utilised Trina 590 WP solar panels and the mounting structure was ERL.

We were responsible for the full scope which was

  • Ramming
  • Drilling
  • Trenching and cable/duct laying
  • Frame build
  • Attaching the modules
  • DC stringing
  • Inverter Mounting
  • AC terminations
  • Hot commissioning

Site Area (Acres)

Installed Capacity (MW)

Installation Timeframe (Months)

Owner and Operator: Enquire
Developer: Enquire
Contractor: Solarizon Ltd
Installed Capacity: 40MW
Installation Date: 01-12-2023
Site Area: 130 Acres
Installation Timeframe: 6 Months
Energy Production: 40,014 KWH pa
CO2 Savings: 102,323.264 KG pa
Azimuth: 180° Module Manufacturer: Trina
Module Wattage: Trina 590 Module
Quantity: 68,000 Mounting
Manufacturer: ERL
Mounting Type: Ground Mount
Inverter Manufacturer: Various
Inverter Quantity: 115

© 2025 Solar Farms Limited. All rights reserved.